Our Past Projects
Alto Civil, Stafford Heights 2021
We were subcontracted to Alto Civil for their Rohrig site, where we performed stormwater installation, including pits and stormwater structures.
Evans Built, Elc Sippy Downs 2019-2020
We carried out stormwater and sewer work, creating culverts and culvert slabs and all associated sewer and stormwater structures.
Shadforth, Aura Development 2019-2021
We were a subcontractor to Shadforths on this project, working on both Stocklands Lendlease Developments. We provided all external and internal works, including stormwater installation, box culverts, culvert slabs, pits and stormwater structures, sewer installation, sewer manhole construction, and PVC watermain installation.
Pacific Civil Solutions, Ipswich 2020
We were the Principal Contractor on this project, responsible for complete site development, including basin excavation, bulk earthworks and clearing, road construction, and deep PE sewer work, including all associated sewer and stormwater structures.
Aura Constructions 2020
We worked on the internal sewer structures, internal watermain, civil stormwater and associated structures on this project.
Woollam, Rockhampton 2021
We performed the installation of stormwater and all association structures on this project.
Sunshine Coast Civil, Palmwoods 2019
On this project, we installed sewer, stormwater and all associated structures.
Mackay Council, 2018
We supervised the relocation of infrastructure in Sarina for this project.
Peak Urban 2021
For this project, we created a footpath to council specifications and an industrial driveway to main road specifications.
Cca Winslow, Downer Edi Batching Plant 2021
We carried out the installation of retaining wall and industrial driveways on this project.